Ship Hull Section Transport

Project Description

A ‘First of its kind’ shipment of 2 ship hull sections weighing 1750 kgs each was successfully completed by Super Freight in 2011. This was featured in the Heavy Lift Magazine (http://ow.ly/r4QI5). Our scope of work included engineering, planning and execution of sea fastening, roll-on cargo at Yantai Port onto suitable barge, securing on board, complying with marine warranty surveyor requirement, shipping & tacking cargo from Yantai to Dabhol, berthing ship alongside at Dabhol to floating dock and rolling off cargo from barge to floating dock.

Project Details

Step 1

Ship hull sections arrive at Yantai Port.

Step 2

First Hull Section being rolled on to the self propelled barge.

Step 3

Second Hull Section Safely on Board.

Step 4

In transit to destination.

Step 5

Arrival at Dabhol Jetty, India.

Step 6

Positioning of Axle Line.